Skip to product information
1 of 8

Generic

Hexagon Garage Lights 6500K, 15-Grid Honeycomb LED Garage Light with Blue Border, 84 Tubes 71400LM 660W Ceiling Shop Lights for Car Detailing, Workshop, Gym, Warehouse, Basement

Hexagon Garage Lights 6500K, 15-Grid Honeycomb LED Garage Light with Blue Border, 84 Tubes 71400LM 660W Ceiling Shop Lights for Car Detailing, Workshop, Gym, Warehouse, Basement

Regular price $342.99 USD
Regular price $342.99 USD Sale price $342.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Brand: Generic

Color: Blue

Features:

  • 1. 15-Grid Honeycomb Design with Blue Border Designed with a large 15-grid honeycomb layout, this hexagon garage light creates a clean, futuristic ceiling effect. The blue outer border adds a bold tech-style accent, making it ideal for garages, car detailing shops, gyms, studios, retail stores, and modern workspaces.
  • 2. Super Bright 6500K Cool White Lighting Built with 84 LED tubes and up to 71,400 lumens based on 850 lumens per tube, this garage ceiling light delivers crisp 6500K cool white illumination. It helps brighten wide areas, reduce dark spots, and improve visibility for detailing, repairs, display, and daily work.
  • 3. 84-Tube Large Lighting System This honeycomb LED garage light includes 60 white 44 cm / 17.32 in light tubes and 24 blue 57 cm / 22.44 in light tubes. The combination of bright white lighting and blue decorative edging gives your ceiling a premium, high-impact look while covering a larger lighting area.
  • 4. 660W High-Output LED Performance Each 44 cm white tube is rated at 7W, and each 57 cm blue tube is rated at 10W, giving the full system a total power of 660W. The PC light tubes help create smooth light diffusion while keeping the structure lightweight, durable, and suitable for long-term indoor ceiling use.
  • 5. DIY Installation Kit Included Each box comes with one installation accessory kit for easier ceiling setup. The modular tube-and-connector structure is designed for practical assembly and wide application, making it a great lighting upgrade for garages, workshops, warehouses, barber shops, photo studios, gyms, and showrooms.

model number: CG19

Part Number: CG19

Package Dimensions: 23.3 x 17.3 x 8.3 inches

View full details